Question

Photo of Dave Brown

0

eRA Status & Attendance Measure

For context, we manually maintain attendance records in various small groups and our worship service using groups of the small group type to manually record attendance (e.g., through the GUI | Group Viewer | Worship Service | Attendance).  I have cases where the individual has met the eRA attendance criteria (e.g., attended 8 out of the last 16 weeks), but have not been recognized in Rock as eRA.

In at least one case, the 8th occurrence was just recorded this week, but I would expect the status to update after the Family Analytics job runs.  This same individual has a "Family Attendance" badge showing "3/16."  Even if the manually entered attendance via the GUI was not considered, this individual has checked in to our Student Area (she is a leader) 4 times in the last 16 weeks.

  • Photo of Nick Airdo

    0

    As long as the check-in group type you are using has the "weekend service" checked (under Admin Tools | General Settings | Group Types, then under the particular group type's General section), you might be running into a bug we recently fixed that was related to how which is currently slated for the 6.1 patch.  (If you're interested, you can more easily see the change delta by looking at this particular commit diff.)

    • DJ Grick

      I was going to post a similar question but saw this. We don't have a single person who is marked as eRA even though the job is calculating the rest of the numbers. I changed myself manually to eRA (I meet the criteria) and when the job ran again it removed me. Is this the same bug or should I setup another question with more details/screen shots to figure this out?